Inspired Ornamental completed the repair work on the Ascension this week. It was impressive and oppressive work with temperatures near 110 degrees at the top of the scaffolding some days. The plaster repair will take a week to dry, because of the humid conditions. Included in the plaster work was replacing the two stained glass windows which were shown to be leaking rain water. JW Graham, the same painters who painted the sanctuary, will begin their work the week of August 10.